Expected Salary Range$104,097 - $146,959 AnnuallyTarget Variable Performance Pay8%The salary range shown above reflects the expected compensation for this position. The final salary offered will be determined based on a holistic assessment of the candidate’s experience, education, training, and alignment with the role’s requirements. For positions covered by a collective agreement, placement within the range will follow the applicable step or classification.Are you ready to be a part of shaping the future of the utility industry? We are a leading utility company on the forefront of innovation, and we are looking for talented engineers to join our team in creating a sustainable and efficient energy landscape for tomorrow.As an Engineer at Toronto Hydro, you will play a pivotal role in developing and implementing innovative solutions across various aspects of utility operations. Collaborating with cross-functional teams, you will have the opportunity to contribute to the planning, design, construction, and maintenance of critical infrastructure and systems. You'll work on projects aimed at optimizing energy distribution, improving grid resilience and enhancing overall operational efficiency.Reporting to the Stations and Capacity Planning team, the incumbent provides a wide range of technical services for internal and external customers to ensure technical soundness, reliability, safety and cost effectiveness of the utility.With a focus on station high-voltage equipment and capacity, you will drive outcomes via strategic planning activities to ensure alignment of investment priorities. You will assess technology options and manage multi-million-dollar investment portfolios to balance risks. You will also serve as the designated planner for multiple stations within Toronto Hydro’s territory, target strategic investments and coordinate stakeholders.In alignment with corporate strategy and values, you will collaborate with a wide range of internal and external stakeholders, including Customer Care, Regulatory, Operations, as well as Hydro One Networks Inc. (HONI), the Independent Electricity System Operator (IESO), as well as numerous vendors and consultants.The incumbent is expected to behave ethically and follow the established code of business conduct, policies and internal control procedures, laws and regulations governing Toronto Hydro.This posting is to fill 1 position which is an existing vacancy. Toronto Hydro reserves the right, in alignment with the applicable collective agreement, to finalize the number of positions filled.Key Responsibilities Prepares engineering, technical or business reports and studies; performs analysis and prepares plans for station and distribution system performance improvements. Participates in short and long-range strategic planning for maintenance activities.Leads strategic investment planning and portfolio reporting (IPPR) for designated investment portfolios.Serves as the technical knowledge repository and risk monitor for designated stations and investment portfolios. Manages risks via strategic prioritization of investments.Develops scopes and work packages in alignment with customer needs and investment plans for design and construction. Collaborates with execution teams and stakeholders to resolve issues.Conducts regular site visits and participate in site meetings to identify challenges and solutions for the successful implementation of investment program.Accountable for the timely, technically accurate and cost-effective application of engineering practices.Compares alternatives based on cost/benefit considerations, customer needs, safety, statistical analysis, and engineering principles, and recommends the optimum solution.Supports the preparation of material and/or technical specifications and standards; reviews proposals from suppliers, contractors and consultants for technical merit and compliance; investigates and evaluates the application of new technologies.Reviews codes, standards, guidelines, long term energy policies, and conduct benchmarking studiesSupports grid modernization, electrification, and utility of the future initiatives…
£104 - £97
hour
FULL TIME
mid
3/27/2026
You will be redirected to TORONTO HYDRO's application portal.